Short answer

A quality inspection checklist defines which characteristics are checked, against which specification, with which gauge, how often and what happens when a part fails. This free quality inspection checklist covers first-article, in-process and final inspection with OK/NOK and reaction plan. Actarion turns it into AR-guided inspections that record every measured value.

Pen drawing of a caliper measuring a flange next to a tablet recording the quality inspection checklist

Why do defects still reach the customer?

  • "Visual check OK" is ticked without a clear acceptance criterion.
  • Inspectors measure differently, so results are not comparable.
  • NOK parts are reworked without anyone recording why.
  • Measured values stay on paper and nobody sees the trend.

What is a quality inspection checklist and when do you use it?

A quality inspection checklist is a structured list of product characteristics with their specifications and inspection methods. Use it at three moments: first-article after setup or changeover, in-process at set intervals, and final before release. In automotive, the characteristics usually come from the control plan (IATF 16949); in other sectors from drawings and customer specifications.

The quality inspection checklist

Header

FieldEntry
Product / part number / revision
Order / batch / lot no.
Inspection typeFirst-article / In-process / Final
Line / machine
Sample size / frequency
Inspector / date / time

Characteristics

#CharacteristicSpecification (nominal ± tol.)Method / gaugeGauge IDSample 1Sample 2Sample 3OKNOK
1Dimension[ ][ ]
2Dimension[ ][ ]
3Visual (scratches, burrs)Per limit sampleVisual, 1 m, daylight lamp[ ][ ]
4Function[ ][ ]
5Marking / labelCorrect and legibleVisual vs. spec[ ][ ]
6PackagingPer packaging specVisual[ ][ ]

Reaction plan on NOK

  • Stop production / quarantine affected parts since last OK check
  • Inform team leader and quality
  • Record nonconformity (NCR no. ______)
  • Root cause and corrective action defined
  • Restart approved by ______

Decision: [ ] Released [ ] Rejected [ ] On hold · Signature ______

How do you fill in the checklist?

  1. 1Characteristics. start with critical and special characteristics from the drawing or control plan. Do not list everything; list what matters.
  2. 2Specification. always nominal and tolerance, or a limit sample for visual checks. "Looks OK" is not a specification.
  3. 3Gauge ID. record which gauge was used so you can trace results if a gauge is later found out of calibration.
  4. 4Values, not ticks. write actual measurements. Values reveal drift before parts go out of tolerance.
  5. 5Reaction plan. decide in advance what happens on NOK. Under pressure, people improvise.
  6. 6First-article. never start series production before the first-article is released.

Example (turned flange, in-process, every 50 parts)

CharacteristicSpecGaugeValueStatus
Outer diameter120.0 ± 0.1 mmCaliper C-014120.04OK
Bore diameter40.0 +0.025/0 mmBore gauge B-00240.031NOK → NCR 0412, tool offset corrected
Burr-free edgesLimit sample LS-07Visual–OK

From paper to digital with Actarion

  • AR guidance: the inspector sees which characteristic to measure and where, directly on the part.
  • Measured values with limits: NOK values are flagged instantly and trigger the reaction plan.
  • Traceability: each result is logged with time, inspector, gauge and photo.
  • Same method every time: every inspector follows the same steps and acceptance criteria.

Frequently asked questions

Product and batch details, characteristics, specifications, methods and gauges, measured values, OK/NOK and a reaction plan.

Further reading

Pen drawing of Jack KesselsPen drawing of Mark Dercksen
No-obligation call

Ready to digitise your first work instruction?

In 30 minutes we look at your process, your numbers and the fastest route to a measurable pilot. No sales pitch, just concrete advice.

Where are you based?
Book a call with Jack

30 min · online · EN, NL or DE