Skip to content
ActARion
Calculate ROIBook a demo
GlossaryMaintenance and operations· 2 min read

What Is OEE? Overall Equipment Effectiveness

OEE (overall equipment effectiveness) shows how much of planned time a machine really produces good parts. Learn the formula, an example and levers.

Ortwin VerreckFounder, ActARion
Updated on

Definition

OEE, or overall equipment effectiveness, measures how much of planned production time is truly productive. It multiplies availability, performance and quality. A low OEE points to stops, slow cycles or scrap. Actarion improves the human side of OEE with guided changeovers, standard work and faster fault handling.

Pen drawing for the glossary term OEE: bar chart of availability, performance and quality

Why does it matter on the shop floor?

  • Machines are 'running' but output is far below plan.
  • Nobody agrees on why the line lost an hour.

What is OEE?

OEE is a KPI that shows which share of planned production time results in good output at full speed. OEE = availability x performance x quality.

Availability captures stops such as breakdowns and changeovers. Performance captures slow cycles and micro-stops. Quality captures scrap and rework. Each factor points to a different improvement lever.

Key elements

  1. 1Availability: run time divided by planned time.
  2. 2Performance: actual output divided by ideal output.
  3. 3Quality: good parts divided by total parts.

Example from the shop floor

A line runs 80% of planned time, at 90% of ideal speed, with 98% good parts. OEE is 0.80 x 0.90 x 0.98, about 71%.

How does Actarion help?

  • Actarion reduces changeover time and human error, two drivers of lost OEE, and logs the data per step.
  • Digital, step-by-step work instructions generated from your SOPs with AI.
  • AR guidance on tablets and AR glasses, with an audit trail per execution.

Frequently asked questions

It depends on the process. Benchmarks vary; compare against your own baseline first.

Further reading

Pen drawing of Jack KesselsPen drawing of Mark Dercksen
No-obligation call

Ready to digitise your first work instruction?

In 30 minutes we look at your process, your numbers and the fastest route to a measurable pilot. No sales pitch, just concrete advice.

Where are you based?
Book a call with Jack

30 min · online · EN, NL or DE