Preventive Maintenance: How to Build a Plan That Gets Done

Contents

Ortwin VerreckFounder, ActARion
Updated on

Short answer

Preventive maintenance is maintenance carried out on a fixed schedule or usage interval, before equipment fails. It reduces unplanned downtime and extends asset life. The plan only works if every task is done the same way and recorded. Actarion guides technicians through each PM task on a tablet or AR glasses and logs every check automatically.

Preventive maintenance: pump with an AR glasses overlay and a maintenance calendar

Why does preventive maintenance slip?

  • PM tasks get postponed when production is busy, then the breakdown comes anyway.
  • The checklist says "inspect belt" and every technician inspects something different.
  • Experienced technicians retire, and their routines leave with them.
  • Signed checklists exist, but you cannot see what was actually measured.

What is preventive maintenance?

Preventive maintenance (PM) is planned work that keeps equipment in good condition before it fails. It sits between reactive maintenance (fix it when it breaks) and predictive maintenance (act on condition data such as vibration or temperature).

StrategyTriggerProsCons
ReactiveFailureNo planning effortUnplanned downtime, safety risk
Preventive, time-basedCalendar intervalSimple to planMay replace parts too early
Preventive, usage-basedOperating hours or cyclesBetter fit to wearNeeds counters
Predictive / condition-basedSensor dataAct only when neededNeeds sensors and analysis

Most plants combine them. Preventive maintenance remains the backbone for most assets.

How do you set up a preventive maintenance plan in 6 steps?

  1. 1List your assets and rank them by criticality. What happens to safety, quality and output if this asset fails?
  2. 2Collect the requirements. Manufacturer manuals, legal inspections and your own failure history.
  3. 3Define tasks and intervals. Per asset: what, how often, by whom and how long it takes.
  4. 4Write each task as a step-by-step checklist. With values, tolerances and photos. Start with the preventive maintenance checklist.
  5. 5Schedule it. In your CMMS or maintenance planning, aligned with production windows.
  6. 6Record, review and adjust. Track completion and findings. Adjust intervals based on what you find.

Example

Monthly PM for a centrifugal pump in a water treatment plant:

  1. 1Check for leaks at the mechanical seal.
  2. 2Measure bearing temperature with an IR thermometer. Measure bearing temperature with an IR thermometer. Value, limit.
  3. 3Listen for abnormal noise and check vibration by hand or meter.
  4. 4Check coupling guard is in place and secured.
  5. 5Check oil level in the sight glass.
  6. 6Record findings and create a work order for any deviation.

Common mistakes

  • Vague tasks. "Check pump" is not a task. Name the measurement and the limit.
  • Intervals copied from the manual and never reviewed.
  • No feedback from findings. If nothing is ever found, the interval may be too short.
  • Paper checklists that are signed in bulk at the end of the week.

How do you measure success?

Measure before you change anything. Record a baseline for two to four weeks, then compare after the rollout using the same definitions. These KPIs are the most useful:

KPIWhat it tells youHow you measure it
PM complianceWhether planned tasks happen on timeShare of PM tasks completed in their window
Unplanned downtimeWhether PM prevents failuresHours of unplanned stops per month
Task completenessWhether every step is doneShare of PM records with all checks and readings
Repeat failuresWhether root causes are fixedFailures on the same asset within 30 days

Keep the list short: three KPIs that the team leader reviews every week beat ten that nobody looks at. Agree on the definitions with quality and finance up front, so the results hold up in a business case.

How Actarion helps

  • Guided PM tasks: each step on tablet or AR glasses, with the overlay on the right component.
  • Values and photos per step: proof of what was measured, not just a signature.
  • Deviations flagged immediately, so a work order can follow.
  • Remote assistance: a specialist can join live when a technician finds something unusual.
  • Pilot on critical assets first, with technology partner DeepSight.

Get started

Download the free preventive maintenance checklist and standardize your next PM round.

Frequently asked questions

Preventive maintenance follows a fixed time or usage interval. Predictive maintenance acts on measured condition, such as vibration or temperature trends.

Further reading

Pen drawing of Jack KesselsPen drawing of Mark Dercksen
No-obligation call

Ready to digitise your first work instruction?

In 30 minutes we look at your process, your numbers and the fastest route to a measurable pilot. No sales pitch, just concrete advice.

Where are you based?
Book a call with Jack

30 min · online · EN, NL or DE